Historical Commission imposes one-year demolition delay on 1892 Kettle House

WESTON — June 23, 2020 — Weston Historical Commission unanimously delays demolition of 1892 Lorenzo Kettle House for one year. The seven-member commission, meeting June 23 by Zoom, voted 7-0 to block demolition of the Samuel Mead-designed colonial revival at 770 Boston Post Road and separately committed up to $2,000 to retain Structures North for a drone-assisted condition survey. Owner Bill Salkowitz, who said he paid roughly $2.5 million for the property in 2006-07 and would sell today for $4 million, told the commission the roof has caved in and the interior is unsafe. Member Henry S. Stone, Jr., a builder, said the house "was totally salvageable when you bought it in 2006." Member Alfred Aydelott, an architect, called continued deterioration since a 2015 six-month delay a question of "demolition by neglect." The commission also approved $1,700 to document the barn at 255 Merriam Street and up to $1,500 for consultant Eric Dray to draft a preservation restriction at 316 Wellesley Street.

Keep reading with a 14-day free trial

Subscribe to The Weston MA Post to keep reading this post and get 14 days of free access to the full post archives.

Already have an account? Sign in. Ask about this instead

A subscription gets you:

  • Subscriber-only posts and full archive
  • Post comments and join the community
  • 24x7 access to local news

Subscribe to The Weston MA Post

Don’t miss out on the latest issues. Sign up now to get access to the library of members-only issues.
jamie@example.com
Subscribe

More local coverage: Middlesex County News · The Wilmington Post · The Winchester Post · The Woburn Post · The Acton Post · The Arlington Post

Part of the Townbrief network — local government coverage for 350+ Massachusetts towns.