Weston advances Route 30 path to 75 percent design phase
WESTON — September 24, 2024 — Weston Traffic and Sidewalk Committee advances Route 30 shared-use path into 75 percent design. Consultant Bridget Myers of Howard Stein Hudson walked the committee and roughly two dozen residents through the cross section for the 3.7-mile corridor — one travel lane each direction, three-foot shoulder, landscape buffer, and a 10-foot shared-use path on the south side that switches to the north at Newton Street. Chair Jay Doyle confirmed MassDOT has approved the 25 percent design and a waiver for single-side pedestrian accommodation. Proposed signals at Pointer Street and Oak Street have been dropped at Select Board preference, with conduit left in place. A resident analysis presented at the meeting estimated 9,700 vehicle crossings of the path per day; "that wrong-way cyclist just puts this over the top," resident Lou said, urging a one-way-with-traffic alternative. Resident Barbara Fullerton objected to tightening the westbound Route 30 right turn onto Highland Street. Three corridor segment meetings are set for Oct. 8, 15 and 22.
Keep reading with a 14-day free trial
Subscribe to The Weston MA Post to keep reading this post and get 14 days of free access to the full post archives.
A subscription gets you:
- Subscriber-only posts and full archive
- Post comments and join the community
- 24x7 access to local news