Weston CPC Unanimously Backs $3.3 Million Pool Renovation for September Vote

WESTON — July 19, 2022 — Weston's Community Preservation Committee voted unanimously to advance three projects totaling up to $3.394 million to the September 13 special town meeting. The committee backed a $3.3 million Memorial Pool renovation — the facility's first capital investment since 1993 — an $85,000 design grant for six new pickleball courts at Birchard Park, and up to $9,000 for a historic marker survey at South Burial Ground on South Avenue. The pool request drew sharp questioning over a mid-week cost increase driven by overlapping construction contingencies, with designer Tom Scarlatta acknowledging that $1,400-per-square-foot pricing for the entry building was "personally ridiculous" but in line with current market bids. Because the pool request exceeds $2 million, it would be bonded and would require a two-thirds supermajority at town meeting; bids are due August 17, and the final warrant figure could be lower. The pickleball courts, if designed this fall, would seek approximately $806,000 in construction funding at the May 2023 annual town meeting.

Keep reading with a 14-day free trial

Subscribe to The Weston MA Post to keep reading this post and get 14 days of free access to the full post archives.

Already have an account? Sign in. Ask about this instead

A subscription gets you:

  • Subscriber-only posts and full archive
  • Post comments and join the community
  • 24x7 access to local news

Subscribe to The Weston MA Post

Don’t miss out on the latest issues. Sign up now to get access to the library of members-only issues.
jamie@example.com
Subscribe

More local coverage: Middlesex County News · The Wilmington Post · The Winchester Post · The Woburn Post · The Acton Post · The Arlington Post

Part of the Townbrief network — local government coverage for 350+ Massachusetts towns.