Conservation Commission Approves Teardown-Rebuild Order for 225 Winter Street

WESTON — October 25, 2022 — Weston Conservation Commission unanimously approves order of conditions for teardown-rebuild at 225 Winter Street. The four-member quorum, chaired by Rees Tulloss, voted to issue the order for a proposed 3,755-square-foot, one-story home on a wetland-surrounded 7.5-acre lot, replacing a fire-damaged 1966 structure owned by a family relocating from California. David Cowell of Hancock Associates told the commission the project qualifies under riverfront redevelopment standards, holds the inner 100-foot riparian zone as a no-disturb area, and replaces a non-compliant cesspool with a Title 5 system. The order is contingent on the applicant obtaining any required stormwater permit before construction begins and specifies a 12-to-18-inch compost filter mitt as perimeter erosion control. The commission also heard an informal preview of a cantilevered deck proposal at 23 Windsor Way that would project over the 25-foot no-disturb zone without ground contact, with commissioners indicating openness to a formal submission provided it includes a wildlife habitat assessment.

Keep reading with a 14-day free trial

Subscribe to The Weston MA Post to keep reading this post and get 14 days of free access to the full post archives.

Already have an account? Sign in. Ask about this instead

A subscription gets you:

  • Subscriber-only posts and full archive
  • Post comments and join the community
  • 24x7 access to local news

Subscribe to The Weston MA Post

Don’t miss out on the latest issues. Sign up now to get access to the library of members-only issues.
jamie@example.com
Subscribe

More local coverage: Middlesex County News · The Wilmington Post · The Winchester Post · The Woburn Post · The Acton Post · The Arlington Post

Part of the Townbrief network — local government coverage for 350+ Massachusetts towns.