Weston fire station group narrows site search after state rejects cemetery parcel

WESTON — April 25, 2024 — Weston Fire Station Working Group converges on south-side superstation concept after state rejects preferred cemetery site. Chair Tom Palmer reported the state requires a roughly $20 million wastewater treatment facility for the cemetery parcel next to the police station because it sits in a Zone A surface water tributary, and offered 200 Ash Street as an alternative. Consultant-led heat mapping of about 25,000 incidents over 10 years confirmed call concentrations at Norumbega, Regis College, the state police barracks and Sunrise, while drive-time polygons showed school parcel 11B at the high school baseball field producing the strongest south-side coverage. Chief Jonathan Woodside said the town's ISO rating is 4/4X and that "fire doubles in size every minute" when discussing any response-time tradeoff. Member Jim Blando objected that test fits are running ahead of a needs-versus-wants program review, which was deferred to May 13.

Keep reading with a 14-day free trial

Subscribe to The Weston MA Post to keep reading this post and get 14 days of free access to the full post archives.

Already have an account? Sign in. Ask about this instead

A subscription gets you:

  • Subscriber-only posts and full archive
  • Post comments and join the community
  • 24x7 access to local news

Subscribe to The Weston MA Post

Don’t miss out on the latest issues. Sign up now to get access to the library of members-only issues.
jamie@example.com
Subscribe

More local coverage: Middlesex County News · The Wilmington Post · The Winchester Post · The Woburn Post · The Acton Post · The Arlington Post

Part of the Townbrief network — local government coverage for 350+ Massachusetts towns.