Conservation Commission approves Deer Path garage, continues Byron Road hearing

WESTON — February 2, 2021 — Weston Conservation Commission approves Deer Path Lane garage and presses AstraZeneca for a formal wetland filing. The commission voted 5-0 to issue an order of conditions for a 590-square-foot garage addition at 29 Deer Path Lane (DEP file 337-1401) presented by Dan Wells of Goddard Consulting. A continued hearing on 14 Byron Road was pushed to Feb. 23 after engineer Mark and LEC Environmental's Rich Kirby presented a redesigned stormwater system and a three-zone invasive-removal plan; attorney George Highland called the negotiations with abutters "very non-adversarial, very productive." On a non-hearing AstraZeneca discussion, VHB's Christopher Wagner argued no Weston filing was required for parking expansion adjacent to two isolated wetlands. Chair Joe Berman and member Alison Fronk Barlow disagreed. "It just seems kind of weird as Conservation Commission," Barlow said. Administrator Michelle warned an enforcement order could compel a Request for Determination. The commission also issued certificates of compliance for the South Side Drainage Phase 1 and two Glenn Road files.

Keep reading with a 14-day free trial

Subscribe to The Weston MA Post to keep reading this post and get 14 days of free access to the full post archives.

Already have an account? Sign in. Ask about this instead

A subscription gets you:

  • Subscriber-only posts and full archive
  • Post comments and join the community
  • 24x7 access to local news

Subscribe to The Weston MA Post

Don’t miss out on the latest issues. Sign up now to get access to the library of members-only issues.
jamie@example.com
Subscribe

More local coverage: Middlesex County News · The Wilmington Post · The Winchester Post · The Woburn Post · The Acton Post · The Arlington Post

Part of the Townbrief network — local government coverage for 350+ Massachusetts towns.