Weston Planning Board sets January 9 votes on Love Lane subdivision and rail trail parking
WESTON — December 19, 2018 — Weston Planning Board advances Love Lane subdivision and rail trail parking toward January votes. The board worked through a final redline review of design guidelines for the two-lot flexible subdivision at 98 Love Lane, reaching consensus on building height language, roofing materials, and driveway character while agreeing to request a short written exhibit from the Historical Commission identifying the significant architectural features of the existing colonial home before draft decisions are issued. On the rail trail, a proposal to build 12 parking spaces at the Concord Road intersection cleared its public hearing after the number of trees to be removed was cut from nine to seven following a December 11 site walk; the board conditioned approval on the consultant providing written tree protection specifications for inclusion in bid documents. The board also gave conceptual approval for either three transplanted conifers or a cedar stake fence — or both — as rear-lot screening at an abutting residential property, requiring decorative metal rather than chain link for any fence section visible from the street. All three formal decisions are scheduled for January 9, 2019.
Keep reading with a 14-day free trial
Subscribe to The Weston MA Post to keep reading this post and get 14 days of free access to the full post archives.
A subscription gets you:
- Subscriber-only posts and full archive
- Post comments and join the community
- 24x7 access to local news