Planning Board accepts engineering peer review for 255 Merriam, sets April 15 vote

WESTON — April 7, 2020 — Weston Planning Board signs off on engineering review for 255 Merriam, targets April 15 vote. Acting Chair Alicia Primer and members Sue Zacharias and Steve Oppenheimer unanimously continued the public hearing on the seven-unit Alternative Residential Compound after the town's engineering peer reviewer said nothing material remained outstanding and the landscape peer reviewer confirmed the applicant's team at Bowler had grown the rear buffer from roughly 60 to 96 evergreens, including 10-to-12-foot firs. Oppenheimer flagged a continuous 8.5-foot retaining wall behind unit 3 as a concern; developer Jeff defended the layout, saying "people that want sprawling backyards aren't going to buy this unit. And we're okay with that." KP Law attorney Katie restructured the draft bylaw so a new Section 6C governs future ARC applications after Sept. 1, 2020 while Section 6D applies only to 255 Merriam, and Zacharias secured added language requiring native regional species as the preferred planting choice.

Keep reading with a 14-day free trial

Subscribe to The Weston MA Post to keep reading this post and get 14 days of free access to the full post archives.

Already have an account? Sign in. Ask about this instead

A subscription gets you:

  • Subscriber-only posts and full archive
  • Post comments and join the community
  • 24x7 access to local news

Subscribe to The Weston MA Post

Don’t miss out on the latest issues. Sign up now to get access to the library of members-only issues.
jamie@example.com
Subscribe

More local coverage: Middlesex County News · The Wilmington Post · The Winchester Post · The Woburn Post · The Acton Post · The Arlington Post

Part of the Townbrief network — local government coverage for 350+ Massachusetts towns.