Traffic Committee Reviews Route 30 Reconstruction 75% Design Plans
Traffic committee reviews Route 30 reconstruction 75% design plans for shared use path. The Traffic and Sidewalk Committee, chaired by Ann Wiedie with members Jay Doyle, Richard Flynn, and Rich Gula, reviewed detailed 75% engineering designs for a four-mile corridor from the Natick town line to
Traffic & Sidewalk Committee · Meeting of March 31, 2026
WESTON — Traffic committee reviews Route 30 reconstruction 75% design plans for shared use path. The Traffic and Sidewalk Committee, chaired by Ann Wiedie with members Jay Doyle, Richard Flynn, and Rich Gula, reviewed detailed 75% engineering designs for a four-mile corridor from the Natick town line to Route 128. Howard Stein Hudson representatives Bridget Myers and Michaela Siegert presented plans including a shared use path, intersection geometry changes, and removal of previously proposed traffic signals based on public feedback.
Committee members raised concerns about design visualization for public meetings, driveway crossing safety, traffic signal evaluation criteria, and elevation grades exceeding 6.5 percent in certain segments.
In the full story:
- The complete report — 376 words
Source: the Traffic & Sidewalk Committee meeting of March 31, 2026, compiled from the official minutes.
Members read the rest of this story and every Weston meeting we cover, in full.
Become a memberAlready a member? Sign inA 30-day free trial needs a payment method. After it, your membership renews at the price shown at checkout until you cancel, which you can do anytime from your account. Subscription terms
Share this brief
Know someone in Weston who follows town government? Share Townbrief Weston: they can sign up free.